Company Records from 1981 to 2014
Largest steel fixing contract to date | 12700 Tonne |
Largest single contract for cut and bent on site | 7700 Tonne |
Largest steel fixing tonnage for 4-man crew on 8 hour shift | 54 Tonne cut and cover tunnel |
Largest tonnage for one man on prefabed beam | 7 Tonne on 8 hour shift |
Largest base steel and starter bars for retaining wall; 2 men on 8 hour shift | 26 Tonne fixed ready for concrete |
Pile Cages< 33 No fixed by 2 men in one 8 hour shift/td> | 12 metres x 400mm spiral x 8 No T 16mm |
Largest tonnage cut and bent without gantry crane | 187 Tonne. Two forklifts and 5 men x 10 hour shifts |
Largest cut steel per day | 75 Tonne of T25mm straights; 2 men in 8 hours |